Skip to main content
Portalcrafter Logo

Portalcrafter · Database Migration

Database Migration Services & Data Migration Solutions

Move Your Business Data Safely, Without Stopping Work

If a data move goes wrong, you can't just rebuild what was lost. So we plan everything first. We map each field and relationship from your old system to the new one, then run both side by side until the numbers match. You get a fixed price and a fixed date, and we don't switch anything over until the data checks out.


What is a database migration?

A database migration is the job of moving your business data from one system to another. That might mean leaving spreadsheets, an Access database, or an old CRM for something that fits how you work today. A good migration also cleans the data up, links related records, and checks every number against the original.

What you get

Who this is for

What we typically build

Legacy system to Airtable

You export from the CRM, Access database, or in-house tool you're leaving. We clean it, remove duplicates, and set it up properly in Airtable instead of dumping it into one big table.

Spreadsheets to a real database

Your Excel or Google Sheets files have quietly become something the business depends on. We rebuild them as linked tables, so the connections between records are built in and nobody has to keep them in their head.

Multi-source consolidation

Your data lives in several tools. We bring it together in one place, sort out the duplicates, and make sure you can trace every record back to where it came from.

Airtable base restructuring

Maybe you have several bases that should be one, or a single base that grew without a plan. We move it into a clean structure without breaking the things that already depend on it.

What it costs

Moving one source into a new base is usually Migration Starter: $2,500 over 10 days. Pulling several sources together, cleaning the data, and running both systems in parallel is Migration Pro: $5,500 over 3 weeks. If you're leaving a big legacy system or merging lots of sources, it becomes a Custom Build.

Migration Starter
$2,500 · One-time · 10-day delivery
Migration Pro
$5,500 · One-time · 3-week delivery
Custom Build
from $9,000 · 4–8 week delivery

Fixed price and date agreed before we start · You own the Airtable base and everything else we build

Full breakdown on the pricing page.

How it works

  1. 1

    Plan the migration

    We look closely at the system you're leaving, including the workarounds your team relies on. Then we map it to the new structure and give you a fixed price.

  2. 2

    Design, then move

    You sign off on the new structure before any data moves. If data goes into the wrong shape, it has to be moved twice, and nobody wants that.

  3. 3

    Reconcile, then switch

    Both systems run side by side until the numbers match and your team is comfortable with the new one. Only then does the old system go read-only.

Frequently asked questions

How do you protect data integrity during the migration?

We check every record against the original before anything gets switched over. Afterwards, your old system stays available in read-only mode, so nothing is deleted. If the numbers don't match, we don't switch.

How long does a database migration take?

Moving a single source usually takes about 10 days. Combining several sources, with cleanup and a parallel run, takes around 3 weeks. Either way, you'll have the date in writing before we start.

Will the business have to stop while the data moves?

No, and that's the point of running both systems in parallel. Your team keeps working in the old system, and we bring across any changes made during the move before the switch.

Can you migrate from a system you have never worked with?

Usually, yes. Nearly every system can export its data. The real work is figuring out what that data means, not the file format. If an export turns out to be incomplete, we'll tell you on the call before we quote.

Before you decide

Let's build it

Ready to move your data?

Most projects start within 48 hours of the discovery call.

See Pricing & Packages
Fixed quote in 24 hoursMutual NDA signed within 24 hoursCancel anytime before kickoff